<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=iso-8859-1">
<META content="MSHTML 6.00.2800.1400" name=GENERATOR>
<STYLE></STYLE>
</HEAD>
<BODY bgColor=#ffffff>
<DIV><FONT face=Arial size=2>Please be aware that on May 18, 2004, the Trinity 
County Board of Supervisors voted favorably to a request by Friends of the 
Trinity River and others to extend the comment period under CEQA for the Trinity 
River Fishery Restoration Supplemental EIR by 30 days to July 22, 2004.  
However, the NEPA comment period remains the same, June 22, 2004, so you still 
need to get those comments into the NEPA co-leads (Hoopa Valley Tribe, 
USFWS and USBR) before their deadline, unless they also agree to extend the 
comment period.</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT> </DIV>
<DIV><FONT face=Arial size=2>Tom Stokely, Principal Planner</FONT></DIV>
<DIV><FONT face=Arial size=2>Trinity Co. Planning/Natural Resources</FONT></DIV>
<DIV><FONT face=Arial size=2>530-628-5949</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT> </DIV>
<DIV>
<P class=n1 
style="MARGIN: 0in 0in 0pt 27.9pt; TEXT-ALIGN: center; mso-list: none" 
align=center><B><U><SPAN style="FONT-SIZE: 10pt">REVISED PUBLIC NOTICE OF 
AVAILABILITY:<?xml:namespace prefix = o ns = 
"urn:schemas-microsoft-com:office:office" /><o:p></o:p></SPAN></U></B></P>
<P class=n1 
style="MARGIN: 0in 0in 0pt 27.9pt; TEXT-ALIGN: center; mso-list: none" 
align=center><B><U><SPAN style="FONT-SIZE: 10pt">Supplemental Environmental 
Impact Report for Trinity River Fishery Restoration 
<o:p></o:p></SPAN></U></B></P>
<P class=n1 
style="MARGIN: 0in -0.5in 0pt; TEXT-INDENT: 0in; TEXT-ALIGN: justify; mso-list: none"><SPAN 
style="FONT-SIZE: 10pt"> <o:p></o:p></SPAN></P>
<P class=MsoNormal style="MARGIN: 0in 0in 0pt"><SPAN style="FONT-SIZE: 10pt">The 
Bureau of Reclamation, Fish and Wildlife Service, Hoopa Valley Tribe, as federal 
co-lead agencies under the National Environmental Policy Act (NEPA), and Trinity 
County, as state lead agency under the California Environmental Quality Act 
(CEQA), have made available for public review and comment the Draft Supplemental 
Environmental Impact Statement/Environmental Impact Report (SEIS/EIR) for the 
Trinity River Fishery Restoration Program (Program).<SPAN 
style="mso-spacerun: yes">   </SPAN>The primary objective of the 
SEIS/EIR is to evaluate alternatives for the Program to meet Federal trust 
responsibilities for tribal fishery resources and restore the fisheries in the 
Trinity River basin to the level that existed prior to the construction of the 
Trinity River Division (TRD) of the CVP.<SPAN style="mso-spacerun: yes">  
</SPAN>Secondary consideration is given to:<SPAN 
style="mso-spacerun: yes">  </SPAN>(a) meeting the Trinity Basin fishery 
and wildlife restoration goals of the Act of October 24, 1984, Public Law 
98-541, and (b) achieving a reasonable balance among competing demands for use 
of Central Valley Project (CVP) water, including the requirements of fish and 
wildlife, agricultural, municipal and industrial, and power contractors.<SPAN 
style="mso-spacerun: yes">  </SPAN><o:p></o:p></SPAN></P>
<P class=MsoNormal style="MARGIN: 0in 0in 0pt -0.5in"><SPAN 
style="FONT-SIZE: 10pt"> <o:p></o:p></SPAN></P>
<P class=MsoNormal style="MARGIN: 0in 0in 0pt"><SPAN style="FONT-SIZE: 10pt">The 
proposed alternatives focus on the 40 miles of Trinity River below Lewiston Dam, 
in Trinity County, California.<SPAN style="mso-spacerun: yes">  </SPAN>The 
direct and indirect impacts of the alternatives occur within and outside the 
Trinity River Basin.<SPAN style="mso-spacerun: yes">  </SPAN>Anticipated 
impacts and benefits are generally discussed in the context of three geographic 
areas:<SPAN style="mso-spacerun: yes">  </SPAN>the Trinity River Basin, the 
Lower Klamath River Basin/Coastal Area, and the Central Valley.<SPAN 
style="mso-spacerun: yes">    </SPAN><o:p></o:p></SPAN></P>
<P class=MsoNormal style="MARGIN: 0in -0.5in 0pt"><SPAN 
style="FONT-SIZE: 10pt; LAYOUT-GRID-MODE: line"> <o:p></o:p></SPAN></P>
<P class=MsoNormal style="MARGIN: 0in 0in 0pt"><SPAN 
style="FONT-SIZE: 10pt; LAYOUT-GRID-MODE: line">A final environmental impact 
statement (EIS) on the Program was issued in November 2000, and a Record of 
Decision (ROD) executed on December 19, 2000, by former Secretary of Interior 
Bruce Babbitt.<SPAN style="mso-spacerun: yes">  </SPAN>The Trinity County 
Board of Supervisors, however, did not certify that document as a Final 
EIR.<SPAN style="mso-spacerun: yes">  </SPAN>In late 2000, Central Valley 
water and power interests filed suit in the U. S. District Court for the Eastern 
District of California seeking to enjoin implementation of the ROD.<SPAN 
style="mso-spacerun: yes">  </SPAN>On March 22, 2001, the district court 
issued a Memorandum Decision and Order preliminarily enjoining the Federal 
defendants from implementing certain flow related aspects of the ROD.<SPAN 
style="mso-spacerun: yes">  </SPAN>In its Memorandum Decision and Order the 
court found that the environmental effects of reasonable and prudent measures in 
the two biological opinions prepared with respect to the project, as well as the 
effects on power in light of the California energy crisis were not adequately 
analyzed in the EIS.<SPAN style="mso-spacerun: yes">  </SPAN>This Draft 
SEIS/EIR addresses the court’s concerns and updates 
alternatives.<o:p></o:p></SPAN></P>
<P class=MsoNormal style="MARGIN: 0in -0.5in 0pt 0in"><SPAN 
style="FONT-SIZE: 10pt"> <o:p></o:p></SPAN></P>
<P class=MsoNormal style="MARGIN: 0in 0in 0pt"><SPAN style="FONT-SIZE: 10pt">The 
purpose of the Draft SEIS/EIR has been amended, consistent with court 
orders.<SPAN style="mso-spacerun: yes">  </SPAN><SPAN 
style="LAYOUT-GRID-MODE: line">T</SPAN>he Draft SEIS/EIR updates information on 
alternatives described in the October 2000 EIS/EIR.<SPAN 
style="mso-spacerun: yes">  </SPAN>These alternatives include:<SPAN 
style="mso-spacerun: yes">  </SPAN>Existing Conditions, No Action, 
Mechanical Restoration (revised to address the court’s concerns and using 
information submitted by plaintiffs), Percent Inflow (modified to address the 
court’s concerns), Flow Evaluation and Maximum Flow.<SPAN 
style="mso-spacerun: yes">  </SPAN>An additional alternative is also 
evaluated:<SPAN style="mso-spacerun: yes">  </SPAN>a 70 Percent Inflow 
Alternative, based on comments documented in the October 2000 EIS/EIR.<SPAN 
style="mso-spacerun: yes">  </SPAN>Consistent with the October 2000 
EIS/EIR, the Flow Evaluation Alternative remains the designated Preferred 
Alternative.<SPAN style="mso-spacerun: yes">  </SPAN>The flow evaluation 
alternative consists of the following components:<o:p></o:p></SPAN></P>
<P class=MsoNormal style="MARGIN: 0in 0in 0pt -0.5in"><SPAN 
style="FONT-SIZE: 10pt"> <o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt">• Variable annual instream flows for the Trinity River 
from the TRD based on forecasted hydrology for the Trinity River Basin as of 
April 1st of each year, ranging from 369,000 acre-feet (af) in critically dry 
years to 815,000 AF in extremely wet years;<o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt"> <o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt">• Physical channel rehabilitation, including the removal 
of riparian berms and the establishment of side channel 
habitat;<o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt"> <o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt">• Sediment management, including the supplementation of 
spawning gravels below the TRD and reduction in fine sediments that degrade fish 
habitats;<o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt"> <o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt">• Watershed restoration efforts, addressing negative 
impacts which have resulted from land use practices in the Basin; 
and<o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt"> <o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt">• Infrastructure improvements or modifications, 
including rebuilding or fortifying bridges and addressing other structures 
affected by the peak instream flows..<o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt"> <o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt">The alternative also includes an Adaptive Environmental 
Assessment and Management (AEAM) Program. The AEAM Program, guided by a Trinity 
Management Council (TMC) and advised by the Trinity Adaptive Management Working 
Group (TAMWG) established as part of this decision and by sound scientific 
principles, will ensure the proper implementation of these measures, conduct 
appropriate scientific monitoring and evaluation efforts, and recommend possible 
adjustments to the annual flow schedule within the designated flow volumes 
provided for in this ROD or other measures in order to ensure that the 
restoration and maintenance of the Trinity River anadromous fishery continues 
based on the best available scientific information and 
analysis.<o:p></o:p></SPAN></P>
<P class=MsoNormal style="MARGIN: 0in 0in 0pt; tab-stops: right 544.5pt"><SPAN 
style="COLOR: black"> <o:p></o:p></SPAN></P>
<H2 style="MARGIN: 0in 0in 0pt"><FONT size=2>Significant effects of the proposed 
project on the environment pursuant to CEQA include water quality, endangered 
species, energy, recreation, agriculture, water supply, groundwater, fisheries 
and land use.<o:p></o:p></FONT></H2>
<P class=MsoNormal style="MARGIN: 0in 0in 0pt"> <o:p></o:p></P>
<P class=MsoNormal style="MARGIN: 0in 0in 0pt"><SPAN 
style="FONT-SIZE: 10pt">Pursuant to NEPA, a 60-day public review period has been 
established for review of the SEIS/EIR. This review period began on April 23, 
2004, and will end on June 22, 2004.<SPAN style="mso-spacerun: yes">  
</SPAN>A 75-day public review period has been established pursuant to the 
California Environmental Quality Act.<SPAN style="mso-spacerun: yes">  
</SPAN>This review period began on May 9, 2004, and will end on July 22, 
2004.<SPAN style="mso-spacerun: yes">  </SPAN><B><SPAN 
style="mso-spacerun: yes">  </SPAN></B>Electronic copies of the 
SEIS/EIR are available for public review on the Bureau of Reclamation’s 
Mid-Pacific website for the Northern California Area Office at <SPAN 
style="BACKGROUND: lime; mso-highlight: lime"><A 
href="http://www.mp.usbr.gov/nepa/"><SPAN 
style="COLOR: windowtext; TEXT-DECORATION: none; mso-bidi-font-size: 12.0pt; text-underline: none"><SPAN 
style="mso-field-code: 'HYPERLINK 'http://www.usbr.gov/mp/ncao''"><U><SPAN 
style="COLOR: blue">www.usbr.gov/mp/ncao </SPAN></U></SPAN></SPAN><SPAN 
style="COLOR: windowtext; TEXT-DECORATION: none; mso-bidi-font-size: 12.0pt; text-underline: none">(click 
on Projects/Activities/Documents, then on Trinity River - Restoration Program). 
</SPAN></A></SPAN><SPAN style="mso-spacerun: yes"> </SPAN>Hard copies of 
the document are available for review at the Trinity County Planning Department 
at 190 Glen Road in Weaverville and 98A Clinic Ave in Hayfork, and at Trinity 
County Libraries in Hayfork, Weaverville, and Trinity Center.<SPAN 
style="mso-spacerun: yes">  </SPAN>Electronic CD copies of the SEIS/EIR may 
be obtained at by contacting the Trinity County Planning Department and free of 
charge (subject to availability).<SPAN style="mso-spacerun: yes">  
</SPAN>The documents referenced within the SEIS/EIR are also available for 
public review at the CH2M Hill office located at 2525 Airpark Drive, Redding, 
California.<o:p></o:p></SPAN></P>
<P class=MsoNormal style="MARGIN: 0in 0in 0pt"><SPAN 
style="FONT-SIZE: 10pt"> <o:p></o:p></SPAN></P>
<P class=MsoNormal style="MARGIN: 0in 0in 0pt"><SPAN 
style="FONT-SIZE: 10pt">Three public hearings have been scheduled to receive 
oral or written comments regarding the project’s environmental 
effects:<o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-pagination: none; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt"> <o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-pagination: none; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt">Thursday, June 1, 2004, 4:30 - 7:30 p.m., Holiday Inn, 
1900 Hilltop Drive, Redding, CA<o:p></o:p></SPAN></P>
<P class=MsoNormal 
style="MARGIN: 0in 0in 0pt; mso-pagination: none; mso-layout-grid-align: none"><SPAN 
style="FONT-SIZE: 10pt">Tuesday, June 3, 2004, 4:30 - 7:30: p.m., Hoopa Fire 
Department, Highway 96, Hoopa, CA<o:p></o:p></SPAN></P>
<P class=MsoBodyText2 style="MARGIN: 0in 0in 6pt; LINE-HEIGHT: normal"><SPAN 
style="FONT-SIZE: 10pt">Tuesday, June 10, 2004, at 7 p.m. or soon thereafter, at 
the Trinity County Planning Commission, Trinity County Board of Supervisors 
Meeting Room, Trinity County Library, 211 Main Street, Weaverville, 
CA<o:p></o:p></SPAN></P>
<P class=MsoBodyText2 style="MARGIN: 0in 0in 6pt; LINE-HEIGHT: normal"><SPAN 
style="FONT-SIZE: 10pt">Written comments are encouraged.<SPAN 
style="mso-spacerun: yes">  </SPAN>Written comments on the Draft SEIS/EIR 
should be sent no later than June 22, 2004 to Mr. Russell Smith, Bureau of 
Reclamation, P.O. Box 723, Shasta, CA 96087; telephone:<SPAN 
style="mso-spacerun: yes">  </SPAN>530-275–1554; fax 530-275–2441.<SPAN 
style="mso-spacerun: yes">   </SPAN>Written comments submitted after 
June 22, 2004 pursuant to CEQA should be sent to Mr. Tom Stokely, Trinity County 
Natural Resources, P.O. Box 156, Hayfork, CA 96041-0156; telephone 530-628-5949; 
fax 530-628-5800.<B><o:p></o:p></B></SPAN></P>
<P class=MsoNormal style="MARGIN: 0in -0.5in 0pt 0in; TEXT-ALIGN: justify"><B 
style="mso-bidi-font-weight: normal"><SPAN 
style="FONT-SIZE: 10pt"> <o:p></o:p></SPAN></B></P><SPAN 
style="FONT-SIZE: 10pt; FONT-FAMILY: 'Times New Roman'; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-US; mso-fareast-language: EN-US; mso-bidi-language: AR-SA">NOTE:<SPAN 
style="mso-spacerun: yes">  </SPAN>If you Challenge the action or proposed 
action in court, you may be limited to raising only those issues you or someone 
else raised through the public hearings and public comment period described in 
this notice, or in written correspondence.<SPAN style="mso-spacerun: yes">  
</SPAN></SPAN></DIV></BODY></HTML>