<html><head></head><body><div style="color:#000; background-color:#fff; font-family:garamond, new york, times, serif;font-size:16px"><div id="yui_3_16_0_ym19_1_1487797166754_69748"><span style="font-family: Arial; font-size: small;" id="yui_3_16_0_ym19_1_1487797166754_69783">Sarah McBride <smcbride@usbr.gov> wrote:</span><br></div><div class="qtdSeparateBR"><br><br></div><div class="yahoo_quoted" id="yui_3_16_0_ym19_1_1487797166754_69770" style="display: block;"><div style="font-family: garamond, new york, times, serif; font-size: 16px;" id="yui_3_16_0_ym19_1_1487797166754_69769"><div style="font-family: HelveticaNeue, Helvetica Neue, Helvetica, Arial, Lucida Grande, sans-serif; font-size: 16px;" id="yui_3_16_0_ym19_1_1487797166754_69768">  <br><br> <div class="y_msg_container" id="yui_3_16_0_ym19_1_1487797166754_69767"><div id="yiv3769486300">

<title>Increased Flows Begin at Link River Dam</title><div id="yui_3_16_0_ym19_1_1487797166754_69766"><span style="font-family:arial, helvetica, sans-serif;font-size:10pt;" id="yiv3769486300"><div id="yui_3_16_0_ym19_1_1487797166754_69773"><img alt="Reclamation News Release Header" src="http://www.usbr.gov/newsroom/images/nrheader.gif" id="yui_3_16_0_ym19_1_1487797166754_69774" class=""></div>

<div id="yui_3_16_0_ym19_1_1487797166754_69772"><strong id="yui_3_16_0_ym19_1_1487797166754_69771">Mid-Pacific Region<br>
Sacramento, Calif.</strong></div>

<div id="yui_3_16_0_ym19_1_1487797166754_69765">MP-17-028</div>

<div>Media Contact: Russ Grimes, 916-978-5100, <a rel="nofollow" ymailto="mailto:rwgrimes@usbr.gov" target="_blank" href="mailto:rwgrimes@usbr.gov">rwgrimes@usbr.gov</a></div>

<div>For Immediate Release: Feb. 22, 2017</div>

<div><span style="font-size:18px;"><strong>Increased Flows Begin at Link River Dam</strong></span></div>

<div>KLAMATH FALLS, Ore. – The Bureau of Reclamation and PacifiCorp are increasing flows at Link River Dam as Upper Klamath Lake has risen above the flood control guidelines. Beginning this afternoon, flows will be increased to bring the Upper Klamath Lake elevation below flood control thresholds.</div>

<div>Link River flows will increase to about 6,000 cubic feet per second while Iron Gate Dam flows are expected to increase to a maximum of 7,700 cfs today, Feb. 22, 2017. The increased flows are expected to extend through the weekend.</div>

<div>Residents and those recreating along the Link and Klamath rivers and on Lake Ewauna should be aware, expect rising water, and take appropriate precautions.</div>

<div>This flow release is being done for flood control purposes, but will also provide a surface flushing flow contributing to fish disease mitigation in the Klamath River.</div>

<div>There is potential for additional increased flows through Link River Dam if Upper Klamath Lake levels continue to rise over the next few months.</div>

<div>For additional information, please contact Laura Williams, Reclamation’s Klamath Basin Area Office, at 541-880-2581 (TTY 800-877-8339) or <a rel="nofollow" ymailto="mailto:ljwilliams@usbr.gov" target="_blank" href="mailto:ljwilliams@usbr.gov">ljwilliams@usbr.gov</a>.</div>

<div align="center"># # #</div>

<div>Reclamation is the largest wholesale water supplier in the United States, and the nation’s second largest producer of hydroelectric power. Its facilities also provide substantial flood control, recreation, and fish and wildlife benefits. Visit our website at <a rel="nofollow" target="_blank" href="http://www.usbr.gov/">http://www.usbr.gov</a>. Follow us on Twitter <a rel="nofollow" target="_blank" href="https://twitter.com/usbr">@USBR</a> and <a rel="nofollow" target="_blank" href="https://twitter.com/ReclamationCVP">@ReclamationCVP</a>.</div></span><br><br><div style="font-family:arial;font-size:8pt;color:black;">If you would rather not receive future communications from Bureau of Reclamation, let us know by clicking <a rel="nofollow" target="_blank" href="http://br.pr-optout.com/OptOut.aspx?686x817x83058x3x1542066x24000x6&Email=tstokely%40att.net">here.</a><br>Bureau of Reclamation, Denver Federal Center, Alameda & Kipling Street PO Box 25007, Denver, CO 80225 United States</div></div>
</div><br><br></div>  </div> </div>  </div></div></body></html>